Commercial ERV & HRV Selections and Quotes

Applied Ventilation helps engineers select and specify commercial air-to-air energy recovery units (ERUs) and helps contractors price equipment for new construction and retrofits across the United States.

Compare equipment by airflow

For an energy recovery ventilator (ERV) or heat recovery ventilator (HRV), compare the recovery type, mounting arrangement and cabinet dimensions. Catalog maximum airflow is a starting point. Engineering checks the supply and exhaust fan operating points at your design pressures.

Browse all Commercial Energy Recovery units

Engineering selections and specifications

Send supply and exhaust CFM, external static pressure for each airstream, summer and winter design conditions, recovery requirements and available space.

If the schedule calls for a dedicated outdoor air system (DOAS) or a make-up air unit (MAU or MUA), include heating, cooling, humidity and leaving-air requirements. Engineering can review whether a recovery section or a complete air handler fits the duty.

Budget pricing and formal quotations

Attach your equipment schedule or enter the project name and quantity. Include the specified manufacturer and model and the delivery ZIP code if known. Tell Sales if you need budget pricing, a formal proposal or submittal data.

Check stock by size before scheduling delivery. Sales confirms current quantities and lead times for the requested configuration.

Equipment terms

Find the wording on your schedule or bid documents. Choose a term to see equipment, send design criteria to Engineering or request pricing from Sales.

388 terms across 23 topics

Equipment names and abbreviations28
Design selection and sizing25
Airflow and static pressure11
Fit, mounting and ductwork30
Recovery mechanisms25
Commercial applications13
Single-room and decentralized16
Design and weather conditions8

Provide summer and winter entering conditions for both airstreams. Identify any minimum discharge temperature and whether outdoor airflow must continue during frost control.

Effectiveness and ratings9
Leakage and outdoor airflow6

Provide the required net outdoor airflow and any exhaust-air transfer limit. Ask Engineering to check the proposed pressure relationship and leakage at the design point.

Controls and power13
Filters and accessories5

List filter ratings and accessories included in the fan duty. Request confirmation of pressure drops and factory or field installation for each item.

Selection documents and schedules18
Submittals and drawings17
Finding an equipment supplier9
Quotes and budget pricing19
Bidding and substitutions20
Stock, lead time and freight15
Replacement and retrofit36
Integrated air handling9
Dedicated outdoor air systems24
Make-up air systems18
Recovery components14